Timber frame and roof trusses of a new single-story house behind a construction fence

ADUs built fromthe ground up

Casitas and ADUs built from the ground up: slab, framing, walls, roof and finishes.

ADU construction

A casita fromslab to roof

We build ADUs and casitas from the ground up: the slab, the frame, walls and roof, and every finish inside.

Send the request

What’s included4 parts

  • Slab

    Excavation, forms and a poured slab with the lines in place.

  • Frame and roof

    Walls framed, roof on, windows and doors set.

  • Inside

    Drywall, tile, fixtures and finishes.

  • Yard tie-in

    Walkways, walls and landscaping that join it to the yard.

Want only part of it? Tell us on the visit and the estimate shows just that.

In depth

Building an ADU or casitain Henderson and Las Vegas

What Henderson, Clark County and Las Vegas allow for a backyard unit as of November 2026, what the 2025 state law changed, and what a build needs from the soil up.

What the 2025 state law changed

Nevada's AB 396, signed on June 6, 2025 and in force since July 1, 2026, requires Clark County and the cities of Las Vegas, Henderson and North Las Vegas, along with Washoe County, Reno and Sparks, to adopt an ordinance that allows ADUs on residential property. Those ordinances may not ban a separate kitchen, demand more than one extra parking space when the house's parking and the street already cover the need, set side or rear setbacks stricter than the main house's, or stop the owner from renting the unit out as housing. They may still ban its use as transient lodging.

The law also says an ADU must meet the residential building codes and is not held to commercial ones, such as a commercial fire sprinkler rule. Where a covered city or county had no compliant ordinance before July 1, 2026, ADUs are allowed on any parcel zoned for residential use without restriction. Our ADU rules guide goes through each place in more detail.

The local rules, as of November 2026

  • Henderson (Development Code as amended by Ordinance 4171, effective August 21, 2026): one ADU per lot, up to 25% of the main house's floor area or 1,000 square feet, whichever is greater, and a tiny house up to 400 square feet. A detached unit 14 feet tall or less needs 5-foot side and rear setbacks and 6 feet from other buildings. The city asks for one parking space, and the ADU can't be sold apart from the house.
  • Unincorporated Clark County calls them accessory living quarters: one per lot, on lots of 4,000 square feet or more, with rental and cooking allowed. On a lot under 10,000 square feet the unit can reach 75% of the house's habitable floor area, and on a larger lot the house's full floor area. Its roof line, colors and materials have to match the house.
  • City of Las Vegas (Ordinance 6963, July 1, 2026): one per lot, no larger than the main house, no special use permit, one extra parking space, and no ADU in front of the house.
  • North Las Vegas: the city's published code (codified through August 5, 2026) still calls for a special use review for ADUs in its single-family districts, which may change under the 2025 law. Call its planning staff before you design.
  • Pahrump sits in Nye County, which AB 396 does not cover. Nye County's planning department takes zoning questions at 775-751-4249.

Soil, slab and summer pours

Clark County requires a geotechnical (soils) report, prepared by a Nevada registered engineer, for any project with a new foundation. The county keeps an expansive-soils map, and its soils map flags areas for clay swell, gypsum, corrosion and collapsible soil. The concrete masonry industry notes that footings in high-sulfate soils carry extra concrete requirements. Before anyone digs a footing, the 811 call goes in at least two working days ahead.

Heat changes how the slab gets poured. The American Concrete Institute lists scheduling pours for the time of day or night when the weather is favorable, and the ready-mix industry's hot-weather guidance adds dampening the subgrade, using windbreaks or fog sprays when it's dry and windy, and curing for at least three days, with a white curing compound to reflect heat.

Permits, plans and who builds it

The valley's building departments review under the 2024 codes: Henderson since January 2, 2026, Las Vegas since January 5 and Clark County since January 11. Henderson takes plans through its DSC Online portal and suggests allowing two to four weeks for plan approval, and structural plans must be drawn by a Nevada-licensed engineer. Check with your HOA first; Henderson's guide warns that HOAs are frequently more restrictive than the city.

An ADU needs a building permit, so Nevada's under-$1,000 handyman exemption doesn't cover it. An owner can build for their own use under the owner-builder exemption; selling or leasing the new structure within a year of completion creates a legal presumption that it was built to sell or lease. You can look up any builder on the Nevada State Contractors Board's license search by license number, company name or owner name.

Utilities and the yard around the unit

Clark County's house and guest house permit guide asks for water and sewer verification and notes that guest houses and detached accessory structures need their own source of water. Plan the routes for water, sewer, power and gas early, because a long trench across a finished yard adds time and cost.

We build ADUs, and we also do the demo, block walls, pavers, irrigation and planting. The path, the wall and the landscaping around a new unit can be part of the same job, with one contractor from the slab to the last plant.

What to have ready

  • Your lot size and the main house's floor area, since both set the size cap.
  • A site plan or survey showing the setbacks, easements and where utilities come in.
  • Your HOA's rules and any approvals.
  • How you plan to use the unit: family, a rental or an office.

Estimates are free.

Sources

How a job runs

Five steps, fromcall to walkthrough

The same five steps whether it’s adu construction on its own or the whole backyard.

  1. 01

    Call or text

    Tell us what you have in mind at (725) 321-5369. A few photos of the yard help.

    • The city and the address
    • Photos of the yard
    • A time that suits you
  2. 02

    Site visit

    Jaime comes out, walks the yard with you and listens to what you want.

    • Measurements taken
    • Samples brought along
    • Grade and access checked
  3. 03

    Free estimate

    You get a free estimate for the job: what we build, with what, and the price.

    • The scope, item by item
    • Materials named
    • The price for the job
  4. 04

    Demo and build

    Demo, base, walls, water, hardscape and turf, in the right order, by one crew.

    • Old material hauled off
    • Base graded and compacted
    • Each trade in its turn
  5. 05

    Walkthrough

    We walk the finished yard together and go over the timer and the care.

    • Timer set and shown
    • Site cleaned up
    • Your questions answered

Questions

Questions wehear a lot

Something else on your mind? Call or text Jaime at (725) 321-5369

01How big can an ADU be in Henderson?

Up to 25% of the main house's floor area or 1,000 square feet, whichever is greater, with one ADU per lot. A tiny house used as an ADU is capped at 400 square feet, not counting lofts.

02Can I rent out my ADU?

AB 396 stops covered cities and counties from banning ADUs as rental housing, though they may ban transient lodging. Clark County's definition of accessory living quarters includes rental. If you build it yourself as an owner-builder, leasing it within a year of completion creates a presumption under NRS 624 that you built it to lease.

03Does an ADU need its own parking space?

Henderson asks for one space per ADU, Clark County one per unit, and Las Vegas one beyond the spaces the house already needs. State law caps the requirement at one extra space when the existing parking and the street cover the need.

04Is a casita the same as an ADU?

Clark County's code enforcement office uses "casita" for a separate structure without a kitchen, while its accessory living quarters may include cooking areas. Under AB 396, covered cities and counties can't ban a separate kitchen in an ADU.

05Does an ADU need fire sprinklers?

AB 396 says an ADU must meet residential building codes and doesn't have to meet commercial ones, including commercial fire sprinkler rules. Ask the building department what the residential code requires for your unit.

Related services

Often builtalongside it

Most yards need more than one trade. The same crew handles all of them, in the right order.

Free estimate

Let’s look atthe yard together

Call or text Jaime, or send the form. We come out, walk the yard with you and give you a free estimate.

  • Free estimate
  • One crew, demo to finish
  • Henderson to Pahrump