What holds a paver patio up
The pavers are the thinnest layer of the job. The Concrete Masonry & Hardscapes Association (CMHA), which now publishes the old ICPI guidance, describes the stack: compacted soil, a crushed aggregate base, about an inch of bedding sand, the pavers, then sand swept into the joints.
For patios, walkways and other foot traffic, CMHA calls for at least 4 inches of base after compaction over well-drained soil. A residential driveway needs at least 6 inches. The soil and the base both get compacted to at least 98% of standard Proctor density, and the base goes down in lifts of 4 to 6 inches, each one compacted before the next.
CMHA's guide uses 60 mm (2 3/8 in.) pavers for patios, walks and driveways and 80 mm units for streets. Pavers made to ASTM C936 have to average at least 8,000 psi in compressive strength and absorb no more than 5% water. The layers under them get most of our time.
Desert soil changes the base
The Southern Nevada Water Authority describes most soil in the Las Vegas Valley as clay, sand and rock-hard caliche. Clark County keeps a soils map and a separate expansive soils map, and the soils map legend lists clay swell, gypsum and collapsible ground among the hazards it tracks. CMHA notes that builders use thicker bases where soils are expansive.
When the dig turns up caliche or soft clay, we sort it out before any base goes in. CMHA is clear that bedding sand must never be used to level an uneven base, because the unevenness shows through the pavers over time. Fixing that later means lifting the pavers and starting again at the base.
Water has to leave the surface. CMHA sets a minimum slope of 1.5%, which works out to almost 2 inches of fall across a 10-foot patio. The edges matter as much: pavers need a solid restraint with at least an inch of contact against their sides. CMHA rules out soil backfill and the flat metal or plastic edging sold for flower beds.
Joints, wind and dust
Joints between pavers run 1/16 to 3/16 inch. After the pavers are laid, a plate compactor makes at least two passes to seat them, and sand fills the joints.
Wind is the desert problem. CMHA calls joint sand stabilizers optional for most paving, but says they have held joint sand well in places with high winds, desert climates included. It recommends them on slopes over 7% and says dry, polymeric-type products suit homes. They add no strength, so they never replace a good base. If joint sand drops more than half an inch below the top, CMHA says to top it up with dry sand, and not with polymeric sand.
Two things surprise people after a new install. A white haze can show up on the pavers: CMHA explains it as efflorescence, harmless to the pavers, and says it can peak in about 60 days. And cutting pavers makes dust that contains respirable crystalline silica, which is why CMHA wants dust control on every saw.
Permits, water rules and digging
As of November 2026, Henderson's building code needs no building permit for walks and driveways that sit no more than 30 inches above grade. Henderson's Development Code lets an uncovered patio up to 1 foot above grade run all the way to the property line. Your HOA may still want plans first; the city's homeowner guide warns that HOAs are often stricter than the city.
If the pavers are part of a grass removal under the SNWA Water Smart Landscapes rebate, ungrouted pavers count as permeable cover in the converted area, while concrete and other impermeable materials are not allowed there. Our rebate guide covers the rest of the program.
Any dig needs a call to 811 first. Nevada law requires notice at least 2 working days and no more than 28 calendar days before excavation, with the dig area marked in white.
What changes the time and the cost
- What comes out first. Old concrete, dead grass or rock has to go before we can grade. We handle the demolition as part of the same job.
- Patio or driveway. A driveway needs a deeper base than a patio.
- Shape and pattern. Curves, borders and herringbone mean more cuts.
- Access. A narrow side gate means wheelbarrows instead of a machine.
- What runs under it. Sprinkler and drip lines often need to move before the base goes in; see irrigation systems.
- Edges and transitions. Steps, seat walls and the line where pavers meet artificial grass or rock all take time.
One contractor handles all of it, from the demo to the last swept joint, and the estimate is free. If you are weighing pavers against a slab, read our comparison of pavers and poured concrete in the desert.
Sources
- PAV-TEC-002: Construction of interlocking concrete pavements Concrete Masonry & Hardscapes Association, revised 2022.
- PAV-TEC-003: Edge restraints for interlocking concrete pavements Concrete Masonry & Hardscapes Association, revised 2022.
- PAV-TEC-005: Cleaning, sealing and joint sand stabilization Concrete Masonry & Hardscapes Association, revised 2022.
- PAV-TEC-006: Operation and maintenance guide for interlocking concrete pavement Concrete Masonry & Hardscapes Association.
- Choosing plants Southern Nevada Water Authority.
- Clark County soils maps (BD-PP-228) Clark County Building Department, revised July 2026.
- Soils guideline map layers Clark County GIS.
- HMC 15.01.130: Building permit exemptions City of Henderson Municipal Code.
- HDC 19.10.5: Setbacks, features allowed within setbacks Henderson Development Code, effective December 20, 2024.
- Homeowner permit guide City of Henderson, January 2025.
- Water Smart Landscapes rebate: residential program conditions Southern Nevada Water Authority.
- NRS 455: Excavation and demolition near subsurface installations Nevada Legislature.












All services